• Vallée Sud Grand Paris

  • Work in progress

  • 6 800 000 € HT

  • 1 970 m² / 488 seated - 790 standing

  • BASE + OPC + CSSI + STAGE DESIGN + CDPGF + GRANTS + SIGNAGE + HQE + asbestos and lead removal

  • Clé Millet : Lead architect + stage designer
    Agence Clair-Obscur : Stage designer
    Projex : Multidisciplinary engineering consultancy + fire safety systems
    Altia : Acoustics
    Diagobat : Environmental engineering consultancy
    Deltexplan : OPC
    CL Design : Signage
    AD Ingé - Groupe Egis : Lead/Asbestos engineering consultancy

  • BDF Silver-level approach, Pacte Fibois and compliance with the Tertiary Decree.

THÉÂTRE DES SOURCES

Fontenay-aux-Roses (92)

Renovation, rehabilitation and extension of the theatre, with particular attention paid to regulatory, organizational, environmental and energy issues.

The renovation project for the Théâtre des Sources is structured around major interventions carried out both in the stage areas and in the reception and service areas, in compliance with regulatory, organizational, environmental and energy targets. It includes:

The creation of a 150 m² rehearsal room matching the dimensions of the main stage and able to accommodate up to 50 people, structurally linked to the redesign of the auditorium in favour of a new flat-floor modularity, where a requalified sightline profile allows capacities ranging from 488 seated places to 790 standing spectators through the retention of the balcony combined with a telescopic stand.

The transformation of the foyer-bar into a warm multifunctional space dedicated both to small-scale performances and to catering.

A requalification of the dressing rooms and the stage facilities, accompanied by acoustic and thermal solutions, placing the building within the framework of the Bâtiment Durable Francilien label – Silver level, the Pacte Fibois, and compliance with the Tertiary Decree.