• SAS Paysages
    (Demathieu et Bard - Sogeprom)

  • Being Constructed - scheduled for march 2024

  • €12,500,000 ex-tax

  • 6 270 m² SHAB (habitable floor area)

  • Core Mission

  • Clé Millet : Architect
    HLB : Mandatory Architect A sector
    MOX : MOE Exe
    Sébastien Sosson : Landscape
    EVA : Technical Studies Office in lanscape
    P.CE Tech : thermical and fluid technical studies
    Étamine : HQE (High-Quality Environmental) technical studies

MEDIA VILLAGE

Dugny (93) - France

Construction of 103 housing units - Sector A of the Media Village (Paris Olympics 2024)

The lot A1 is located in the Planned Development Zone of the Media cluster, spanning the municipalities of Dugny, La Courneuve and Le Bourget, with SOLIDEO (Société de Livraison des Ouvrages Olympiques) as the developer.

The first phase is intended to host journalists and technicians from around the world during the 2024 Olympic Games; a second phase will sustain the project beyond the Olympic Games

The project consists of two distinct buildings, arranged in a staggered formation and treated similarly, using constructive bricks with a 4-stories height and an emergence up to 7 stories.

This crosswise organization aims to provide unobstructed views to the residences and optimal sunlight exposure for all.